Solution studio

E-commerce & parcel sorting solutions

Connect parcel induction, identification and destination sorting in one planned goods flow, with a defined route for exceptions.

Parcel sorting systems, Equipment overview
Equipment illustration

Sorting starts before the divert. Parcels need a controlled entry, a readable identity and enough space between items for the chosen routing mechanism. Plan normal destinations and the recovery route together, including what happens when a barcode cannot be read or an output lane is full.

How the goods move

  1. Induct & space

    Present parcels in a defined orientation and spacing before identification.

    Equipment in this solution
  2. Identify & measure

    Associate the barcode with weight and dimensions where the dispatch process needs them.

    Equipment in this solution
  3. Route & recover

    Send parcels to assigned destinations and provide a defined route for unread or rejected items.

    Equipment in this solution
Process schematic. Equipment positions and interfaces are adapted to the site.

Equipment in this solution

Choose the right arrangement

Match the sorter to the parcel

Wheel diversion suits selected stable bases; bags, very small items and unstable goods may need a different transport surface or sorting mechanism. Confirm the complete parcel mix before choosing.

Design for the peak and the exception

Use peak arrival patterns, destination split and operator clearing time to size the system. A nominal sorter rate alone does not define the capacity of the whole line.

Prepare your project brief

  • Smallest and largest parcel, base material, bags and fragile items
  • Peak arrivals, destination count and distribution by output
  • Barcode position, warehouse data interface and exception handling

Agree the complete project scope

The proposal defines the goods, layout, controls, software interfaces, guarding, delivery and commissioning responsibilities. Capacity and acceptance criteria are specified for the selected configuration.

Planning questions

Can it connect to an existing warehouse system?

Define the message format, routing response time, ownership of parcel IDs and behaviour during lost communication. The software connection is an agreed part of the project scope.

Tell us what you need to move.

Send your name, email and handling task. If known, add the goods, desired length, usable width and inlet/outlet heights to your message. These technical details are optional.

Enable JavaScript or reload this page to send the quote form.

* Required fields

We use these details to handle your enquiry. Optional measurement is controlled separately. Read the privacy information.