Parcel sorting systems for warehouse and dispatch lines

Parcel sorting systems, Equipment overview

Custom-made parcel sorting systems planned around your goods, destinations and available layout. Configure conveying widths, heights, induction, diversion and controls as one routing project.

Made to order for your goods and layout

Every conveyor is custom made for the client. Define the length, width, heights, conveying surface and controls around your operation, with the selected configuration and project scope set out in writing.

Legal seller
Krona Robotics UAB
Company registration
Lithuania
Estimated delivery
60 days
All products
CE certified
Company certification
ISO 9001
Warranty
2 years

Estimated delivery: 60 days. Your written quotation confirms the delivery schedule, freight arrangements and responsibilities for installation and support. Two-year warranty. The written quotation specifies coverage, the commencement date, exclusions, spare parts and service arrangements.

Request a written quote ↗

How the equipment works

Induction and main flow

The main line receives parcels with enough separation for identification and routing decisions. Describe the actual parcel mix and sustained flow as well as short peaks.

Destination connections

Divert modules connect the main line to destination routes. Goods stability, branch geometry and downstream capacity determine which mechanism fits.

Data and exceptions

Barcode inputs, routing logic and warehouse software must agree on the destination. Unread items, full lanes and recovery routes need a defined process.

Application & fit

Start with the parcel mix, smallest base, identification method and sustained flow through the complete process. Induction, spacing, destination branches and downstream capacity determine the mechanism and layout. Routing data, unread items, blocked lanes and recovery paths are included in the operating sequence.

Plan the application and handover points

Illustrative workflow for discussing your project. This is not a dimensioned installation drawing or a completed customer project.

  1. Separated identified parcels
  2. Parcel sorting systems
  3. Destination lanes and exceptions

Check before selecting the configuration

Map induction, identification, routing rules, divert modules and exception handling as one system. Throughput depends on parcel mix, spacing, destinations and recovery behaviour.

For a selected divert junction within an existing system: Wheel sorters ↗

Configuration choices

Made to order for your operation

Each sorting system is made to order as a complete parcel-routing project. Conveyor dimensions, diversion mechanisms and data flow are selected around the same operating case.

Line dimensions and site layout
Choose lengths, conveying widths, transfer heights and branch routes around the building and goods.
Parcel support and diversion
Select conveying surfaces and transfer mechanisms for parcel bases, weights and directions.
Induction and destination layout
Plan feed positions, item spacing, destination count and downstream connections.
Identification and software interfaces
Define barcode inputs, destination records and exchange with warehouse or routing software.
Controls and exception handling
Specify sensing, lane availability, unread items, recovery and commissioning responsibilities.

Layout and operating choices

Routing layout and destinations

Set the main line, branch routes, heights and destination connections around the site and parcel flow. Select diversion mechanisms that support the goods through each transition.

Identification and control sequence

Define how parcels are identified, destinations assigned and movements coordinated. Include software interfaces, unread items, full lanes and recovery arrangements.

Discuss your custom conveyor

Configuration information

These application details define the made-to-order conveyor. Include the dimensions and operating requirements you know; the remaining choices can be developed from your handling task.

  • Minimum/maximum parcel envelope (mm), base and weight (kg/item)
  • Destinations, induction and sustained/peak flow conditions
  • Barcode/data inputs, controls and software interfaces
  • Exception handling, recovery and commissioning ownership

Delivery and line connections

The selected conveyor is configured to connect with your equipment and site. Include the destination, transfer levels, power supply and control signals. The quotation defines the delivery schedule and installation, connection and commissioning responsibilities.

Delivery & support ↗

Parcel sorting systems: Configuration and ordering questions

Explore the configuration, integration and ordering decisions for this equipment. Send your load details and layout to discuss your own project.

Can the sorting layout be made for our building?

Yes. Main line dimensions, transfer heights, branches and destinations are configured around the site and parcels. Send a floor plan with access routes, existing equipment and receiving positions.

What parcel range should the enquiry describe?

Include the smallest and largest dimensions, base type, weight and packaging condition. The parcel mix determines support, spacing, identification and diversion requirements across the full route.

How is the sorting mechanism chosen?

Parcel support, layout, branch directions and required flow guide the selection. Powered wheel diversion and pop-up transfer use different contact patterns and cycles, so a mechanism is selected for the actual goods and destination geometry.

Is line speed the same as sorting capacity?

No. Induction, parcel spacing, identification, diversion and downstream availability constrain sustained flow. Specify both the normal operating requirement and short peaks so the complete sequence can be assessed.

Can sorting connect to our warehouse software?

Define the identifier, destination data, record format and required interface. The quotation identifies the controls and software integration scope, including how commands and item records are exchanged.

What happens to unread parcels or full destination lanes?

These cases need a defined process rather than an assumed automatic outcome. Describe the desired exception route, stop or recovery sequence and how operators are informed.

Can a sorting project be installed around an existing line?

Provide the current layout, interfaces and any operating constraints during installation. The proposed scope can identify staged connections, commissioning tasks and the division of responsibilities.

What determines the cost of a parcel sorting system?

Parcel range, line dimensions, destinations, mechanisms, identification, controls and integration affect the price. Required exception handling, site work and commissioning also contribute to the project scope.

What delivery estimate and certification apply?

Estimated delivery: 60 days. The written quotation confirms the custom scope, delivery schedule and installation responsibilities. All products are CE certified; the company holds ISO 9001 certification.

Discuss your custom conveyor ↗

Tell us what you need to move.

Send your name, email and handling task. If known, add the goods, desired length, usable width and inlet/outlet heights to your message. These technical details are optional.

Enable JavaScript or reload this page to send the quote form.

* Required fields

We use these details to handle your enquiry. Optional measurement is controlled separately. Read the privacy information.